 |
| Three pieces of track equipment rest on Wisconsin & Southern's Elkhart Lake siding. Today, trains do not regularly use WSOR trackage north of Plymouth; this trackwork is fueling speculation that a rock transload operation will soon begin south of Elkhart Lake, and this is where trains would run around. |
| Time and Date: 9:03 AM, Friday, June 25, 2010 |
|
| Location: Elkhart Lake, Wisconsin |
| Approximate Latitude: 43° 49′ 51″ N (43.831° ) |
| Approximate Longitude: 88° 0′ 48″ W (-88.01339° ) |
| |
| Railroad: Wisconsin & Southern RR Co. [WSOR] |
| Subdivision: Plymouth |
Approximate Milepost: 146.0 |
| |
| Camera: Canon EOS 20D |
| Shutter: 1/320 sec |
Aperture: F10 |
| ISO: 200 |
Focal Length: 33.0 mm |
| White Balance: Sunny |
Lens Range: 28-135mm |
| Exposure Mode: Manual |
Focus Mode: One-shot |