 |
| Work on the Markesan Sub finished, the conductor of L595 gets ready to drop their cars here at Brandon. Cars will be picked up and hauled to Horicon later this evening, after all the work on the Oshkosh Sub has been completed. |
| Time and Date: 1:51 PM, Friday, December 18, 2009 |
|
| Location: Brandon, Wisconsin |
| Approximate Latitude: 43° 44′ 17″ N (43.73822° ) |
| Approximate Longitude: 88° 46′ 58″ W (-88.78296° ) |
| |
| Railroad: Wisconsin & Southern RR Co. [WSOR] |
| Subdivision: Markesan |
Approximate Milepost: 161.3 |
| |
| Camera: Canon EOS 20D |
| Shutter: 1/320 sec |
Aperture: F10 |
| ISO: 200 |
Focal Length: 75.0 mm |
| White Balance: Sunny |
Lens Range: 28-135mm |
| Exposure Mode: Manual |
Focus Mode: One-shot |