 |
| Welded rail is ready to be installed on the WSOR main line to Horicon. This was the maiden voyage for the renovated E9B unit number 102. WSOR shop forces in Horicon spent about a year and a half of spare-time effort on making the unit hum. |
| Time and Date: 10:40 AM, Thursday, August 21, 2008 |
|
| Location: Rubicon, Wisconsin |
| Approximate Latitude: 43° 20′ 27″ N (43.34088° ) |
| Approximate Longitude: 88° 27′ 24″ W (-88.45681° ) |
| |
| Railroad: Wisconsin & Southern RR Co. [WSOR] |
| Subdivision: Milwaukee |
Approximate Milepost: 126.5 |
| |
| Camera: Canon EOS 20D |
| Shutter: 1/640 sec |
Aperture: F9 |
| ISO: 200 |
Focal Length: 80.0 mm |
| White Balance: Auto |
Lens Range: 28-135mm |
| Exposure Mode: Manual |
Focus Mode: One-shot |